The N10 Micro Lab refurbishment project was a challenging task as the lab was in constant use throughout the project of refurbishment and reconfiguration. This required a four phase approach which had to be carefully planned and implemented and constant contact with our client. Highline successfully completed the project on time and exceeded expectations to deliver a full refurbishment including, flooring and ceiling replacement, re-design and installation of H-Vac system. Safety door replacement, redecoration and electrical installation. Bespoke fire alarm systems and lighting were designed and installed. The final result was an area suitable for purpose and a huge improvement to a busy, specialised working environment.