A very large area that is in constant use urgently required a replacement floor as the existing was cracked, uneven and could be a potential H&S hazard. Highline worked closely with the client to plan and implement a floor removal, preparation andreplacement project which all needed to be carried out out of normal working hours. Throughout the project the area had to be made safe so that staff could access the cafeteria during the day whilst works were completed during nights/weekends. The finished result looks modern and changes the entire look of the area.